The problem: a reserve that earns nothing
A classic UPS-plus-genset setup is a cost with no revenue. A BESS functions as a reserve with a longer hold-up time while simultaneously generating market revenue.
How it works
The PCS in grid-forming mode takes over supply of the islanded section in under 20 ms. The EMS maintains a minimum reserve SOC (typically 50%), trading the surplus capacity in the market.
Sizing parameters
| IT load | BESS power | Capacity | Hold-up time |
|---|---|---|---|
| 2 MW | 2 MW | 4 MWh | 2 h |
| 5 MW | 5 MW | 10 MWh | 2 h |
| 10 MW | 10 MW | 20 MWh | 2 h |