Building permit for energy storage — the 300 kWh threshold

Short answer

An energy storage system with capacity above 300 kWh requires a building permit. For installations from 1 MWh upward, this always means the full path: compliance with the local zoning plan (MPZP) or a zoning decision, a building design, and fire safety sign-off.

  • 300 kWh threshold — below this, a simple notification is sufficient
  • MPZP or zoning decision (WZ) — the most common schedule bottleneck
  • Sign-off by a certified fire safety expert is mandatory

When a building permit is required

Building law exempts storage systems up to 300 kWh from notification and permit requirements. All the industrial and utility-scale installations discussed on this site are above that threshold.

Spatial planning

If the site is covered by a local zoning plan (MPZP), we check whether technical infrastructure is permitted. Otherwise a zoning decision (WZ) is needed — realistically 4–8 months.

Environmental decision

Energy storage systems are generally not classified as projects that may significantly affect the environment, but for projects above 1 ha of built-up area, or when combined with a grid substation (GPZ), an environmental impact information sheet may be required.

Permitting timeline
StageDuration
Zoning decision (WZ, if no MPZP)4–8 months
Building design and approvals2–3 months
Building permit65 statutory days
Connection conditions and agreementin parallel, 6–12 months

FAQ