Topologies and power sizing
The PCS is sized to the block's power rating, not its capacity. A 5 MWh container in a 2-hour configuration needs 2.5 MW of converter power; in a 4-hour configuration, 1.25 MW is sufficient.
Efficiency and round-trip efficiency
System-level AC-AC efficiency is the product of PCS efficiency, transformer efficiency, and parasitic losses. A realistic figure for a modern liquid-cooled system is 86–89% at 0.5C.
Grid-forming and grid code requirements
- Grid-following operation as standard for grid-connected installations
- Grid-forming for islanded operation, data centers, and stability support
- LVRT/HVRT, Q(U) and P(f) regulation compliant with NC RfG
- Interface to the EMS and to the operator's SCADA system