LFP cells for energy storage — CATL, EVE, Hithium, BYD

Short answer

Today's 20ft containers use LFP cells ranging from 314 Ah to 1,130 Ah, rated at 8,000–11,000 cycles with a 10–12 year warranty at a 70% SOH threshold. Cell capacity determines whether a unit holds 5.0 or 6.9 MWh.

  • 314–1,130 Ah — determines container capacity
  • 8,000–11,000 cycles at 90% DoD
  • 10–12 year warranty at a 70% SOH threshold

Why the cell manufacturer matters more than the container brand

Cells account for 55–65% of system value and are the only component that can't be replaced without dismantling the modules. The integrator can change, but the cell stays in the installation for 15–20 years — that's why we always specify the exact manufacturer and model in our offer.

Cell comparison table

LFP cells used in 20ft containers
ManufacturerModelCapacityCyclesWarranty
CATLEnerC / EnerOne (306–314 Ah)306 / 314 Ah8,000–10,00010 years / 70% SOH
EVE EnergyLF628628 Ah10,00010 years / 70% SOH
HithiumMIC 11301,130 Ah11,00012 years / 70% SOH
BYDBlade 2710 Ah10,00010 years / 70% SOH
REPT BatteroWending 320320 Ah8,00010 years / 70% SOH
CALBL500587 Ah10,00010 years / 70% SOH

CATL — EnerC and EnerOne series

The most widely used reference in grid-scale projects. The 306–314 Ah cells deliver 5.0–5.6 MWh in a 20ft container, backed by a very large installed base and predictable servicing.

EVE Energy — 628 Ah cells

Double the cell capacity means fewer interconnections and less parameter spread within the string. The container reaches 6.25 MWh in the same footprint.

Hithium — MIC 1130 Ah for 4–8 h storage

A 1,130 Ah cell designed for long discharge durations. It enables 6.9 MWh in a 20ft unit with a claimed 11,000 cycles, lowering LCOS in 4-hour projects.

BYD — Blade 2, 710 Ah

A prismatic design with a large heat-dissipation surface, pairing well with liquid cooling at 0.5C.

How to verify which cell you're actually getting

  • Specify the cell manufacturer and model in the contract, not just the proposal
  • Module serial numbers and a factory capacity test report
  • IEC 62619, IEC 63056, and UN 38.3 certificates for the delivered batch
  • Right to a factory acceptance audit (FAT) before shipment
  • Capacity test after commissioning as an acceptance condition

FAQ