Scale 1–3 MWh
1 MWh Energy Storage — a Single Container, Ready-to-Deploy Block
Short answer
The base block of 1 MW / 2 MWh is a single liquid-cooled 20ft container, weighing about 32 t, with a footprint of 15 m² plus a service zone. Grid connection on the MV 15 kV or LV 0.4 kV side for capacities up to 1 MW.
- 1 × 20ft container
- 0.5–1.5 MW
- 0.5C (2h) or 0.25C (4h)
Who this scale is for
- A manufacturing plant with 0.8–2 MW contracted capacity and pronounced peaks
- An EV charging hub where charger power exceeds the grid connection capacity
- A 0.5–2 MW PV farm constrained by curtailment
Configuration, site and grid connection
Number of containers1 × 20ft container
System power0.5–1.5 MW
C-rate0.5C (2h) or 0.25C (4h)
Land footprint15–40 m² including the service road
Voltage levelLV 0.4 kV up to 1 MW, above that MV 15 / 20 kV
Indicative CAPEXPLN 1.9–2.6 million for a 1 MW / 2 MWh block (delivery and commissioning)
Delivery schedule16–22 weeks from contract signature
Revenue models realistic for this scale
- Peak shaving and reduction of the capacity fee during peak hours
- Daily arbitrage on the electricity purchase price
- Better utilization of the existing grid connection without expansion
Reference implementation
| Parameter | Value |
|---|---|
| Configuration | 0.5–1.5 MW / 1–3 MWh |
| Containers | 1 × 20ft container |
| Grid connection | LV 0.4 kV up to 1 MW, above that MV 15 / 20 kV |
| Delivery time | 16–22 weeks from contract signature |
Related
Applications and technology for this scale
Application · 2–40 MWh
Solar Farm
No more negative prices and curtailment — shift production to the evening peak.
Application · 1–10 MWh
Manufacturing Plant
Peak shaving and capacity-fee reduction for contracted capacity of 1–10 MW.
Technology
Liquid Cooling
Impact on degradation, round-trip efficiency and self-consumption.
FAQ
Request a quote — pricing in 48 h
Send us the project scale in MWh, the site location and the available grid capacity. We reply with a configuration, CAPEX range and delivery schedule.